Diesel used by site equipment and construction/demolition waste are the two largest carbon items of construction projects. With NetZero E.S. you can calculate data per site and turn it into a report ready for investor or municipal requests.
Heavy Equipment & Generator Fuel
Diesel used by excavators, cranes and generators is the largest Scope 1 item of a construction site.
Steel & Material Use
The embodied emissions of steel reinforcement and other construction materials are a significant but frequently skipped part of Scope 3.
Construction & Demolition Waste
How much site waste is recycled directly determines the project's total environmental impact.
Multi-Site Tracking
For firms running several sites at once, collecting data centrally and consistently is a demanding operation.
Sector Quick Start
The "Construction" template pre-fills heavy equipment diesel, forklift fuel, steel and waste fields with typical starting values.
Site-Based Facility Management
Define each construction site as a separate facility, track their data independently, then combine them into a single report.
Detailed Waste & Raw Material Calculators
Calculate steel/metal use and landfill/recycling waste rates separately, based on real quantities.
Report Ready for Investors and Authorities
Produce an ISO 14064 compliant, QR-verifiable PDF report and share it with your project stakeholders.
Start calculating for your construction site today
Start with a free Standard account; choose the plan that fits later.
Start with the Construction Template